Skip to content

Ecosystem maturity

Audience: leadership
Status: building
Owns: product / delivery lead
Depends on: Ecosystem map, Live status board

Elimi’s near-term focus is CAP (RPL + NSQ) plus Orchestrator shared services. LMS HTTP/gRPC/Prisma contracts are now specced (implementation still ahead). WorkMasters remains an idea-level stub. Shared packages (@yourorg/common, @yourorg/proto) are building.

For what the team is shipping this week, use the Live status board — not this page. This page is the durable readiness snapshot.

Area Phase Notes
Docs site (this repo) Building Narrative SoT + delivery sync; OpenAPI/proto published copies synced from ecosystem root
CAP — RPL Specced Lifecycle, domain, modules; validated OpenAPI + Prisma; workflow abstraction documented
CAP — NSQ / Standard Assessment Specced Lifecycle + induction / evidence / DO+PRF; shares workflow engine with RPL
LMS Specced OpenAPI + Prisma + events + recs gRPC; service shell not implemented
WorkMasters Idea Stub; competency check against CAP later
Orchestrator Specced Auth, notifications, identity, payment, storage; validated OpenAPI (35 ops) + Prisma; gRPC Identity/Payment
Shared packages (pkg / proto) Building @yourorg/common and @yourorg/proto scaffolds installed and verified
Backend stack / system architecture Specced Express, Prisma, Postgres, Redis, RabbitMQ+outbox, gRPC, OTel→SigNoz, GitHub Actions — ADR · Architecture · Handover
  • Idea — Named; not specified for build
  • Specced — Enough docs for implementation to start
  • Building — Implementation in progress
  • Alpha / Beta / GA — Increasing production readiness

See also Ecosystem map and How to contribute.